Skip to main content
Meetings · survey

Brief your surveyor.
We will not write their report.

Name the firm with the booking. They attend at your cost. The seal number and the photographs are the record.

Who hires
You
Who pays
You
Report
Theirs, unedited
Seal method
Not discussed
Port illustration for a surveyor briefing
Zarkaar Group, Shesha Basti Talab, Multan. Updated 2026-10-02.

The surveyor brief is a short meeting so your inspector knows which lot, which temperature, and which cut-off they are walking into. You hire them. You pay them. We do not choose the firm, and we do not edit the report after they leave. Name them when you book the loading week, not at the gate.

We do not publish how seals are built, how a number is copied, or how a lock is opened. The brief covers the lot identity, the set point, and who is allowed inside. It is not a lesson in defeating a seal. If that is the question, the meeting ends.

What we will put on the table

Identity of the lot, and the limit of the visit.

Mango and onion

Mango pre-cool and the reefer sit at 8–12°C. Onion after the cure sits at 0–4°C. The surveyor photographs the set point, the cartons or bags, and the seal number. They do not retie the load to improve a picture.

Rice, corn, cotton

The lab sheet and the fumigation certificate are the quality file. The surveyor can see that those papers match the lot marks. They cannot issue a new lab sheet. ISPM 15 on the pallet is a photograph of the mark, not a speech about how to fake one.

The arrival end

A claim at discharge has 48 hours. The Pakistan file is this survey, the seal, and the loading photographs. A surveyor who was never named cannot be invented after the ship sails.

Who may hear the brief

Your named surveyor and our people. Not a crowd, and not a trainee who will not be on the pass. The port authority still decides entry. Our brief does not override a terminal refusal.

FAQ

Frequently Asked Questions

Will you recommend a survey company?
No. You appoint them and you pay them. We need the name before the day.
Can you add a paragraph to their report?
No. The report is theirs. If a fact about our lot is wrong, say so at the time. We do not rewrite it later.
Will you explain the seal?
We will show the seal that is going on the container. We will not explain how seals are defeated or copied.
Can the surveyor come to Multan instead?
If the inspection is at the packhouse or the mill, say that. A Karachi seal still happens at the port. One city does not replace the other.

Get in touch

Send the firm’s name with the booking.

We will set a brief, or we will say the cut-off has passed.

Mon–Sat 9:00 AM – 7:00 PM PKT · Shesha Basti Talab, Multan, Punjab, Pakistan